New boiler added to power plant
Dozens of Facilities and Campus Services staff watched on Tuesday afternoon as a large crane lifted a 42,000-pound boiler over the Wake Forest power plant, then lowered it through a hole in the roof to its final position inside. The new boiler, which joins […]
Categories: Happening at Wake