Due to stormwater tie-ins in the middle of the road and the large equipment required, all campus thru traffic from Reynolda Road will be rerouted onto Allen Easley Street for approximately one week beginning Monday, June 13. Pedestrians will be rerouted around the construction zone. Faculty Drive residents will be detoured around the construction via a single-lane gravel pass-through in Lot S. Traffic is strongly encouraged to avoid the area when possible and use Polo Road or University Parkway entrances during the closure. The intersection is expected to return to single-lane traffic by Friday, June 17.

Archives